MEM501 Individual Assignment 2

Part A: Project Scenario

1. Overview

In this assignment, you will produce a complete, professional Project Management Plan (PMP) for a real-world engineering project scenario assigned to you. The PMP is the primary planning output of PMBOK Process Group 2 and integrates all ten Knowledge Area subsidiary plans into a single governing document. Your deliverable must read as a professional project document — not an academic essay — written in structured plan language with appropriate tables, diagrams, and formal section headings.

This assignment directly mirrors the work of a practising project manager in the initiation and planning phases of an engineering project. It tests your ability to apply, synthesise, and produce — not just describe — the tools and frameworks taught across MEM 501 Sessions 1–11.

2. Assigned Project Scenarios

Your instructor will assign one of the following scenarios. Each scenario is sufficiently complex to support a full PMP. You may not choose your own scenario unless explicitly permitted by your instructor.

ID Project Title Brief Description
S-01 Al Dhafra Solar Farm — Phase 2 Expansion Expand an existing utility-scale solar photovoltaic facility in Al Dhafra, Abu Dhabi by 300 MW. Involves land preparation, PV module procurement and installation, grid connection, substation upgrades, and commissioning.

Owner: Abu Dhabi National Energy Company (TAQA). Duration: 30 months. Budget: AED 1.8 billion.

S-02 Abu Dhabi University — Engineering Faculty Building Design and construct a new 12-storey Engineering Faculty building on the ADU Abu Dhabi campus. Includes academic laboratories, smart lecture halls, student collaboration spaces, and a rooftop solar installation. Owner:

ADU Facilities Management. Duration: 24 months. Budget: AED 280 million.

S-03 Sharjah Industrial Water Recycling Plant Design, build, and commission a 50,000 m³/day industrial wastewater treatment and recycling plant in the Sharjah Industrial Area. Includes civil works, mechanical and electrical systems, SCADA integration, and regulatory approval. Owner: Sharjah Environment & Protected Areas Authority. Duration: 28 months. Budget: AED 420 million.
S-04 Yas Island Smart Mobility

 

Hub

Develop a multi-modal smart transport interchange on Yas Island integrating autonomous vehicle drop-off zones, EV charging infrastructure, a pedestrian bridge, and a real-time passenger information system. Owner: Department of Municipalities and Transport, Abu Dhabi. Duration: 18 months. Budget: AED 175 million.

Part B: Assignment Guidelines

3. Learning Outcomes Assessed

CLO Description & How Demonstrated
CLO 3 Develop comprehensive project management strategies by integrating and applying advanced principles across all project phases — demonstrated by producing a complete, integrated PMP covering all PMBOK Knowledge Areas.
CLO 6 Implement advanced strategies for managing project scope, time, cost, resources, quality, communication, risk, and stakeholders using critical thinking — demonstrated by the quality, completeness, and professional rigour of each subsidiary plan.
CLO 1 Design advanced PM processes using leadership and innovative strategies — demonstrated through your integrated change control approach, stakeholder engagement strategy, and risk response planning.

4. Deliverable Structure — Required Sections

Your PMP must contain all nine sections below in the exact order listed. Each section is a subsidiary plan or baseline document. Sections must use professional PM documentation language — structured prose supported by tables and diagrams where specified. Bullet-point-only sections will be penalised.

Sec. PMBOK Section Title Required Deliverable Content Word Guidance
1 4.1 Project Charter All 12 PMBOK charter components; signed authority block; assumption log 350–450 words
2 5.1–5.4 Scope Management Plan & Scope Baseline Scope Statement (8 components); WBS hierarchy diagram (hand-drawn or digital, min. 3 levels, 15+ work packages); WBS Dictionary extract (3 packages); scope change control procedure 500–650 words + WBS diagram
3 6.1 Schedule Management Plan Scheduling methodology; activity sequencing rationale; milestone schedule table (≥8 milestones); schedule compression policy (crashing vs fast-tracking) 300–400 words + milestone table
4 7.1 Cost Management Plan Cost estimation approach; budget summary by phase; contingency reserve policy; cost control thresholds and escalation triggers 300–400 words + budget table
5 8.1 Quality Management Plan Quality standards applicable to project; quality metrics (≥4); quality assurance activities; quality control checkpoints; non-

 

conformance management

300–400 words
6 9.1 Resource Management Plan RACI matrix (min. 8 roles × 8 work packages); resource breakdown structure; team development approach 250–350 words + RACI table
7 10.1 Communications Management Plan Stakeholder Register (≥8 stakeholders with

 

Power/Interest assessment); Engagement Assessment Matrix (Current vs Desired level); Communications Register (≥6 communication events)

350–450 words + tables
8 11.1–

 

11.5

Risk Management Plan & Risk Register Risk strategy; RBS; Risk Register (≥10 risks with ID, description, category, P×I score, level, owner, response strategy, residual risk); 5×5 matrix (drawn) 400–500 words + register table + matrix
9 12.1 Procurement

 

Management Plan

Make-or-buy decisions for 3 work packages; contract type selection with rationale; vendor selection criteria; FIDIC or local contract reference 250–350 words

5. Formatting & Submission Specifications

Parameter Requirement
Word Count 3,500 – 4,500 words (body prose only; excludes cover page, headings, tables, diagrams, and references)
Document Format Single Word (.docx) or PDF file submitted via Blackboard
Font & Size Arial or Times New Roman, 12pt body text; 14pt section headings
Line Spacing 1.5 throughout
Margins 1 inch (2.54 cm) on all sides
Cover Page Full Name, Student ID, Section, Submission Date, Assigned Scenario ID & Title, Word Count
WBS Diagram Hand-drawn (scanned) or digitally drawn hierarchy; must show minimum 3 levels and 15+ work packages; must be embedded in the document
Risk Matrix Hand-drawn or digitally drawn 5×5 matrix with all 10+ risks plotted; embedded in document
Table Formatting All tables must have clear headers, borders, and be readable without zooming
References Minimum 5 sources in APA 7th Edition; must include PMBOK or Pinto; sources should be cited where frameworks are applied
File Naming MEM501_A2_[StudentID]_[Scenario-ID].pdf or .docx

 

Get Help with MEM501 Project Management Individual Assignment 2 Before Deadline

Chat with Experts

Get reliable support for your MEM501 Project Management Individual Assignment 2 through the Workingment platform, which provides UAE Assignment Help for students. Access expert guidance for project management assignments, along with useful resources, structured solutions and practical academic support. You can also explore our Free Assignment Sample to understand how project management assignments can be structured and presented effectively. Whether you need help understanding the assessment requirements or improving your assignment approach, Workingment provides dedicated academic support for UAE students.

60-Second Quote

Get Your Free Academic Quote

No hidden fees · Instant response · 100% confidential

Workingment Unique Features

Latest Free Samples for University Students

FLAT 15% OFF

AVAIL FLAT 10% OFF

+ Extra 5% OFF

FREE PLAGIARISM REPORT
Applicable on all orders
ORDER NOW →
★★★★★ 4.9/5 | 5118+ Reviews
WhatsApp
Online Assignment Help in UK