Looking for Plagiarism-Free Answers for Your US, UK, Singapore, New Zealand, and Ireland College/University Assignments?
Talk to an Expert| Category | Assignment | Subject | Education |
|---|---|---|---|
| University | Open Polytechnic (OP) | Module Title | BSNS4603 Project components |
| Assessment Title | Assessment 1 |
|---|---|
| Academic Year | 2026/27 |
20%
Complete and submit your assessment according to the Open Polytechnic’s Assessments webpage. This includes information on academic integrity, formatting, word limits and referencing.
By submitting your assessment, you confirm that it is your own, original work.
Across each of the three assessments for this course, you will develop and update a schedule, Gantt chart, reports, and cost estimate for a project scenario. Each assessment will build on the work of the previous one.
The aim of Assessment 1 is for you to apply your knowledge of the planning phase of project management to generate a project schedule. You will select and use project management tools in order to do this.
There are two (2) tasks in this assessment.
For Task 1 you are required to create a draft schedule comprising a minimum of 30 tasks, showing the dependencies between tasks and their likely start and finish dates to achieve the project requirements.
For Task 2 you will evaluate the draft schedule and techniques for their usefulness.
You work for Nearly New Renovations Limited (NNR) as a trainee project manager. You have just been hired to help an experienced project manager, Gerry Atrick, who is running the National All Polytechnic (NAP) refurbishment of the Student Villas at the North Island campus. You were just getting acquainted with the project when Gerry fell ill and she asked you to cover. She has given you access to her notes and is confined to bed, so communication is possible but is slow and not recommended.
The student village (SV) within the campus grounds is a self‐catering complex of 10 villas housing eight students in each. The village adopts a modern, co‐educational, multi‐cultural student hostel concept. Both New Zealand and international students live together (mixed genders), and although each student has their own furnished bedroom, students share the lounge, kitchen, and bathroom facilities in each villa.
Each villa includes:
Your role was to manage components of the refurbishment of these 10 villas, but now you’ll need to run the whole thing! You’ve read Gerry’s notes and discovered the following.
The customer wants to update and refresh the look and feel of the villas. You will not be doing any demolition or construction of walls. Sam Wright, Head of Student Services, based at the Northern Campus, outlined some of the background information in an email about this project and you found it in Gerry’s notes. The notes give you the following information.
You can only gain access to the premises from 1 July, but you can start working on the project from 1 May as the budget will be available then. There are up to five reliable engineering students who will be willing to help with the work. They are willing to work in the evenings and over weekends.
Gerry had started a work breakdown structure (WBS) (see Appendix 3). It’s not perfect, but it’s a great starting point. It defines the scope as she understood it. Your first job is to review the WBS, add any missing tasks, decide what to include and what to summarise, then prepare a likely schedule for the proposal to NAP. Obviously, you’ll need to ensure that you can meet the timeline required.
You will now need to apply your project planning knowledge to generate a draft schedule for the Refurbishment Project Scenario using the Excel template (BSNS4603 WBS Excel Gantt Template; see Appendix 2 of this document for an example).
Use the information supplied in the Scenario and in Appendix 1 of this document to complete the tasks. You are not required to include any people, tools or material resourcing, or costs for the project at this stage. This will be done in other assessments in this course.
a. Your planning chart must include the following:
(70 marks)
b. Your chart must identify operational tasks logically and be professionally presented. The information must be communicated clearly and effectively.
(20 marks)
For submission:
Task 1 total: 90 marks
The draft schedule you created in Task 1 will contribute towards a cost estimate for the project scenario in Assessment 2 of this course. How useful will the draft schedule you created in Task 1 be in contributing to producing a cost estimate for the NAP Student Accommodation Refurbishment project? Comment on the methods you used and whether there is anything that you think should be done differently.
(Word count guideline: 150 words)
(10 marks)
(Total: 100 marks)
| Task 1a | 55.5 – 70 marks | 45 – 55 marks | 35 – 44.5 marks | 28 – 34 marks | 1 – 27 marks |
| Apply project planning knowledge to generate a project planning chart. | A comprehensive and accurate Gantt chart is generated which includes all of the following.
All tasks are linked to ensure an efficient execution of the project.
|
A comprehensive and accurate Gantt chart is generated which includes all of the following.
Almost all tasks are linked to ensure an efficient execution of the project.
|
A detailed and accurate Gantt chart is generated which includes all of the following although there may be minor errors or omissions.
A majority of tasks are linked correctly to ensure the efficient execution of the project. |
A reasonable attempt has been made to complete the Gantt chart, which includes most of the following although it may lack accuracy or be incomplete in places.
Not all tasks are linked correctly to support the efficient execution of the project but there is evidence this has been attempted. |
A reasonable attempt has not been made to complete the Gantt chart and/or the information is largely inaccurate or insufficient in many places.
Few or no tasks are correctly linked to ensure an efficient execution of the project. |
| Task 1b | 16 – 20 marks | 13 – 15.5 marks | 10 – 12.5 marks | 8 – 9.5 marks | 1 – 7.5 marks |
| Presentation and communication | Chart identifies operational tasks logically and is highly professional. The information required is communicated effectively. | Chart identifies operational tasks and in almost all instances is logical and communicates information professionally. | Chart identifies operational tasks mostly logically and communicates information professionally. | Chart identifies most operational tasks logically however it lacks in professionalism or clarity of communication. | Chart does not identify operational tasks logically or lacks professionalism. Purpose is not communicated sufficiently. |
| Task 2 | 8 – 10 marks | 6.5 – 7.5 marks | 5 – 6 marks | 4 – 4.5 marks | 1 – 3.5 marks |
| Evaluation | Accurate and insightful evaluation comments are included that are highly relevant to the scenario and techniques used. | Relevant evaluation comments are included that are relevant to the scenario and techniques used. | Relevant evaluation comments are included that are mostly relevant to the scenario and techniques used. | Comments are somewhat evaluative and have limited relevance to the scenario and techniques used. | Comments are not evaluative and have little to no relevance to the scenario or techniques used. |
Do you need answers for BSNS4603 Project components Assessment 1?
Chat With Experts NowGet expert support for your BSNS4603 Project components Assessment 1 with our trusted services in New Zealand. We offer clear guidance, easy explanations, and step-by-step help so you can complete your work with confidence. Students looking for Project Management Assignment Help and Assignment Help New Zealand can also explore our Free List of Assignment Samples and Examples, designed to make learning simpler and faster. All content is written freshly, without plagiarism, and in clean, easy language. Improve your understanding, save time, and score better with our reliable academic assistance.
Hire Assignment Helper Today!
Let's Book Your Work with Our Expert and Get High-Quality Content