Category | Assignment | Subject | Engineering |
---|---|---|---|
University | Queensland University of Technology (QUT) | Module Title | EGB272: TrafÏc and Transport Engineering |
Individual component: 5%Group component: 10%
You are expected to submit two separate submissions:Individual Submission (5%): Each student must submit their own individual report. Details of the individual report are provided in Section 3.1, and the marking rubric is in section 4.1
Group Submission (10%): Only one submission per group is required. Details of the group report are provided in Section 3.2, and the marking rubric is in Section 4.2.
The Queensland Department of Transport and Main Roads (TMR) is interested in evaluating the performance of the intersection at Logan Road and Padstow Road in the suburb of Eight Mile Plains(see Figure 1). This intersection experiences significant congestion during peak periods, leading tosubstantial delays for commuters. Complaints regarding excessive delays on both Logan Road andPadstow Road. have raised concerns about driver frustration, which may contribute to road rageincidents and an increased risk of crashes. Additionally, prolonged trafÏc congestion results inconsiderable socio-economic losses and environmental impacts.
Do You Need EGB272 Assignment of This Question
Order Non Plagiarized AssignmentTo assess congestion levels, you are commissioned to analyse the data from Bluetooth MACScanners (BMS) installed at the site. Figure 2 shows the locations of the BMS devices:
The following site-specific details apply:
Representative morning peak-hour travel time data from the BMS scanners is provided in Table 1,and refer to the metadata in Table 2 additional data is available in the Excel files tt_stat_logan.xlsxand tt_stat_padstow.xlsx, which contain travel time statistics for upstream and downstream links.Data collection took place over a one-week period, from Monday, April 1, 2019, to Friday, April 5,2019.
With the above information, you should estimate the congestion levels for the study site. For this, you should analyse the BMS travel time data and report your observation for the study network.
Thisincludesa) Space mean speed trends over the week for all the links. You can present your findings inthe table as below:
You are expected to make two submissions:
Each student must independently submit the Executive Summary of the report, summarizing the key aspects of their work in their own words.
Note: This is not a group submission.The executive summary can be around 200 words.
You should submit a single, adequately formatted engineering report for the whole team, including appended analyses.
There is no specified page limit; however, you are expected to write economically and clearly. The report can be finalised within 1000-1200 words. The word limit is just a guideline.
Your report should include the following sections for Individual and group submissiona) Introduction: You should present your understanding of the client brief and the tasks youneed to complete.
You should also include assumptions made in the analysis.(Weight 2%)b)
Methodology: Present the methodology you have adopted to quantify the congestion.(Weight 3%)c) Analysis: Present your findings on the site's congestion including the space mean speedtrends over the week for all the links, and discussion on the travel time reliability. You can present your findings in the table as below:
Buy Answer of EGB272 Assignment & Raise Your Grades
Pay & Buy Non Plagiarized AssignmentGet expert assignment help for EGB272: TrafÏc and Transport Engineering Assignment ? We specialize in offering high-quality Australia Assignment Help, with an option for students to pay our experts to take on their assignment challenges. Need a reference? We also provide a free list of assignment examples to help you get started. With years of experience, our writers deliver 100% plagiarism-free content and offer unlimited revisions to meet your needs. Trust us to help you excel in your studies!
Let's Book Your Work with Our Expert and Get High-Quality Content