Project Question: Impact Analysis in a Distributed System with High PV Penetration for System Planners and Operators
You are an engineer working for Selangor Power Distribution Company (SPDC), a utility serving the suburban areas of Shah Alam, Selangor. SPDC has been experiencing an unprecedented surge in rooftop solar PV installations over the past two years, driven by generous government incentives and increasing environmental awareness among residents.
The utility is particularly concerned about a residential feeder in a newly developed eco-friendly neighbourhood called Green EcoPark. This feeder, known as GH-F1, has the following characteristics:
11 kV radial distribution system with 14 nodes
Peak load: 3 MVA
Current PV penetration: 35% of peak load (1.2 MVA)
Projected PV penetration by end of next year: 50% of peak load (2.4 MVA)
SPDC has received complaints from customers about voltage fluctuations, and the utility’s own monitoring systems have detected instances of reverse power flow during periods of high solar generation and low demand.
As an operation and planning engineer, you are tasked with analysing this situation and proposing solutions. Your project should include the following components:
Develop a distribution model using appropriate software
You may select any test system as a study model (small system)
Run load flow simulations for the following scenarios:
a) Base case (current 35% PV penetration)
b) Future case (80% and 100% PV penetration)
Analyse and compare voltage profiles, power flows, and losses for both scenarios.
Propose at least two different solutions to mitigate the reverse power flow issues.
Potential solutions may include, but are not limited to:
o Energy storage systems
o Reactive power control
o Dynamic voltage regulation
o Demand-side management
For each proposed solution, provide:
o A detailed description of the solution
o Implementation strategy
The project will be evaluated based on:
Are You Looking The Solution of EEPM553 Case Study?
Order Non Plagiarized AssignmentNeed help with your EEPM553 Power Systems Operation And Planning Assignment? Get expert guidance and improve your grades with our Assignment Helper Malaysia. We provide clear explanations, step-by-step solutions, and a Free List of Assignment Samples to help you understand better. Our academic experts ensure your work is accurate, original, and well-structured. Make your learning journey easier and achieve academic success with our trusted support.
Let's Book Your Work with Our Expert and Get High-Quality Content