BPM307 Question 1

Prepare the preliminary cost plan for your new industrial project located at Changi East and is on reclaimed land.

BPM307 Cost Planning and Estimation TMA02

  • Land size 3.5 ha
  • GFA 55,000m2
  • Multi-storey carpark 5,000m2
  • Concept design
    Green Mark – Platinum Positive Energy certification. To achieve positive energy industrial building, 3,000 sq m solar panel with 20% of the electricity generated to be returned to the national grid. Indicative cost: Solar panel – supply and install $500/m2 including structural support.
  • External works – Incremental cost due to larger land size is $80/m2 site area.
    Below is the building design and cost plan for a completed industrial project awarded in 2018, with total GFA of 35,000 m2 and with land size of 0.5 ha. The project is certified Green Mark Platinum

BPM307 Cost Planning and Estimation TMA02

BPM307 Cost Planning and Estimation TMA02

Table Q1 – Cost Plan for Past Project.

References:

  • Appendix 1 – Cost references of Singapore Construction Cost Data.
  • Appendix 2 – BCA Tender Price Index
  • Appendix 3 – Schedule of rate

Prepare the elemental cost plan with the elemental rates and elemental costs for the proposed development.

Derive the project unit rates per m2 for the estimated construction cost.

Do You Need BPM307 TMA02 of This Question

Order Non Plagiarized Assignment

BPM307 Question 2

(a) Based on the data in Table Q2, estimate the unit rate for reinforced green concrete of Grade 40 ($/m3 ).

BPM307 Cost Planning and Estimation TMA02

(b) Briefly explain to the client how the use of eco green concrete or other sustainable materials and technologies can benefit the project.

(c) Based on the materials price indices published by BCA, discuss the implications on construction materials.

BPM307 Question 3

Architect issued instruction to replace cement sand screed flooring to homogenous floor tile to a 10 m x 20 m room.

Contract specifications.

Homogeneous Floor Tiles

12 mm thick homogeneous floor tile on 38 mm thick cement sand screed backing.

a) Prime cost supply rate $30/m2

  • Wastage 5% (tiles)
  • Contract profit and attendance on PC rates is 10% (a) Prepare the variation cost estimate for the changes instructed by the Architect using Appendix 4 – Variation Template.

(b) Based on the variation in Q3(a), build up the composite rate for the 200 mm thick reinforced concrete suspended floor (rebar ratio 180kg/m3 ) including the finishes

Buy Answer of BPM307 TMA02 Assignment & Raise Your Grades

Request to Buy Answer

Are you stuck on BPM307 Cost Planning and Estimation TMA02 Assignment? So now you can be stress free as you have reached the right place and here our expert team is providing you Management Assignment Help services. Look no further, we are available 24/7 to help you, so now be stress free and focus on studies. If you want solutions then we also provide free assignment samples that will help you clear your concepts. Contact us today and increase your academic grades with singapore assignment help!

Workingment Unique Features

Hire Assignment Helper Today!


Latest Free Samples for University Students

RBP020L063H Leadership and Change Management Assignment Sample

Category: Assignment

Subject: Management

University: University of Roehampton

Module Title: RBP020L063H Leadership and Change Management

View Free Samples

HRMM080 Ethical and Responsible Leadership AS2 Reflective Portfolio Sample

Category: Assignment

Subject: Management

University: University of Northampton

Module Title: HRMM080 Ethical and Responsible Leadership

View Free Samples

ACAD1346 The child’s live Experience Developing Confidence Learners Assignment Sample

Category: Assignment

Subject: Education

University: University of Greenwich (UOG)

Module Title: ACAD1346 The child’s live Experience Developing Confidence Learners

View Free Samples

NUR7011 Developing Healthcare Leaders Assignment Sample | BPP

Category: Assignment

Subject: Nursing

University: BPP University

Module Title: NUR7011 Developing Healthcare Leaders

View Free Samples

Project Management, Leadership and Skills: Planning & Control Portfolio Example

Category: Assignment

Subject: Management

University: University of Salford Manchester

Module Title: Project Management, Leadership and Skills: Planning & Control

View Free Samples
Online Assignment Help in UK