OFFERS! offer image Get Expert-crafted assignments
Save 51%

BPM203 Construction Project Management Group-Based Assignment 01 Jan 2026 Presentation | SUSS

Looking for Plagiarism-Free Answers for Your US, UK, Singapore, New Zealand, and Ireland College/University Assignments?

Talk to an Expert
Published: 24 Mar, 2026
Category Assignment Subject Management
University Singapore University of Social Science (SUSS) Module Title BPM203 Construction Project Management
Assessment Type Group-Based Assignment 01
Academic Year 2026

BPM203 Group-Based Assignment 01 Jan 2026 Presentation | SUSS

BPM203 Group-Based Assignment 01 

This assignment is worth 14% of the final mark for BPM203 Construction Project Management.

The cut-off date for this assignment is 29 March 2026, 2355 hrs.

This is a group-based assignment. You should form a group of a maximum 4 members from your seminar group. Each group is required to upload a single report via your respective seminar group site in Canvas. Please elect a group leader. The responsibility of the group leader is to upload the report on behalf of the group.

Note to Students:

You are to include the following particulars in your submission: Course Code, Title of the GBA, SUSS PI No., Your Name, and Submission Date

Question 1 Objectives

  • Understand the management of a project
  • Evaluate the project sensitivities
  • Appraise the role of various governmental agencies a project
  • Practical application of design and Quality Control in a real-life project

With an increase in demand commercial establishment near Changi T5 of Singapore, the Ministry will construct a business and lifestyle hub in the area, which offers a comprehensive range of services. This design-bid-build development is with the site area of 40 hectares.

This project will be constructed near existing MRT stations, and airport terminals, posing a huge challenge to the restriction of space. To prevent site congestion, just-in-time delivery method should also be adopted, and the site should be divided into a few zones of low-rise buildings.

The client wants to build this on a fast-track basis without any accidents and with emphasis on Sustainability, Water conservation and Green Mark. Stages for construction of this project are:

  • Site Clearance
  • Drainage
  • Foundation and Superstructure works including finishing
  • Electro-Mechanical, Finishes and External Works

Report Preparation

(a) Demonstrate your understanding of this assigned task by applying the project management knowledge and develop your report under the following phases:

(i) Initiation phase – Idea
(ii) Public Feedback on project implementation
(iii) Design phase – How it is to be done? Interfacing between disciplines, Design innovations & value addition
(iv) Interfacing with Governmental agencies
(v) Implementation phase – Implementa.tion
(vi) Features that enable the building to be classified as the highest standards in Green Mark
(vii) Public Safety and Environmental protection
(viii) Follow-up phase – Maintenance / Defects resolution
(ix) The reporting system within the organization executing the project
(x) Outline of your GBA team members and their diversity (in fields of work)

(b) You can apply the PMBOK Knowledge areas.

(c) The report should have a program of the project in MS Project and be reflective of the work. The program should be submitted as an attachment with between 15-30 activities.

Report

It should be in the form of a professional contractor report. Use the following title:

“Development of Changi East”

Mechanism to prevent free riding: Marks will then be allotted accordingly, which may be substantial. Evidence is required, such as group meeting attendance list and email correspondences. Your team should also show effort to warn and encourage slack members.

It should not come as a surprise.

 (100 marks)

Buy Custom Answer Of BPM203 Construction Project Management GBA01 & Raise Your Grades

Chat with Management Experts

Struggling with your BPM203 Construction Project Management group assignment at SUSS? Don’t worry—we’ve got you covered. Our Singapore Assignment Help offers clear, practical guidance tailored to your coursework, making complex concepts easy to understand. From planning and scheduling to risk and cost control, we deliver well-structured, plagiarism-free solutions. Get reliable Project Management Assignment Help with real SUSS Assignment Samples Solutions that match university standards. Save time, reduce stress, and boost your grades with support designed especially for students like you in step of your journey.

Workingment Unique Features

Hire Assignment Helper Today!


Latest Free Samples for University Students

QUALIFI L5 BUS503 Business Development Assignment

Category: Assignment

Subject: Business Management

University: Qualifi

Module Title: BUS503- Business Development

View Free Samples

CII M92 – Insurance business and finance Coursework Assignment Answers

Category: CII Assignments

Subject: business

University: _______

Module Title: CII M92 – Insurance business and finance

View Free Samples

ECE5004 Professional Practicum 1: Early Childhood Education and Care Practicum Report Sample

Category: Assignment

Subject: Healthcare

University: New Zealand School of Education

Module Title: ECE5004 Professional Practicum 1: Early Childhood Education and Care

View Free Samples

BSBWHS414 Contribute to WHS Risk Management Assessment Answers Solution PDF

Category: Assignment

Subject: Management

University: _____

Module Title: BSBWHS414 Contribute to WHS Risk Management

View Free Samples

BSBWHS413 – Contribute to the implementation and maintenance of WHS consultation and participation processes Assessment Answer

Category: Assignment

Subject: Management

University: ________

Module Title: BSBWHS413 – Contribute to the implementation and maintenance of WHS consultation and participation processes

View Free Samples
Online Assignment Help in UK