BBY 31406 Construction Project Management Assessment Project And Presentation Sem 1 2025/26 | UTHM

Request Plagiarism Free Answer Published: 07 Jan, 2026
Category Assignment Subject Management
University Universiti Tun Hussein Onn Malaysia (UTHM) Module Title BBY 31406 Construction Project Management

BBY31406 Assessment Project And Presentation

FAKULTI PENDIDIKAN TEKNIKAL DAN VOKASIONAL
UNIVERSITI TUN HUSSEIN ONN MALAYSIA
86400 BATU PAHAT JOHOR
INSTRUCTION SHEET
TITLE:
RISK AND CONSTRUCTION MANAGEMENT PROCESS
PROGRAMME CODE : BACHELOR TECHNOLOGY (BBY)
SEM/SESSION : SEMESTER 1 / 2025/2026
COURSE CODE : BBY 31406
COURSE NAME : CONSTRUCTION PROJECT MANAGEMENT
LECTURER/INDUSTRIAL
SUPERVISOR
: IR. TS. NOOR ALIFF BIN ZAINUDDIN
TASK OBJECTIVE No. LEARNING OUTCOMES
  1. To assembles the criteria of project management process in creating successful project team (PLO2, LOD5,P7)
  2. To verify risk with effective communication skills and medium in handling construction project (PLO9, LOD11, A4)
TASK DURATION: 7 weeks
REPORT SUBMISSION DATE: 7 January 2026
DELIVERY TECHNIQUE:  
TASK IMPLEMENTATION SCHEDULE:
TASK WEEK Requirement
1. Planning project strategy 7 Try to visit any contruction site to help gathering reliable information for your project.
2. Project Development 8 – 9  
3. Prepare 3D Model/ Graphic 10 – 11  
4. Risk management process 12 Document / Literature Riview
5. Final Report 13 Collected data/ document/ literature review

TASK INSTRUCTION:

You are an engineer at a construction company. Your company has received a tender to build a residential house. As the engineer, you are required to prepare the following items to be presented to the client.

  • Plan for construction of the required residential area
  • Your project should consist of;
  • Detail of project (including organisation chart, company profile)
  • Pricing and Contracting (including tender)
  • Planning of sources – labor, materials, equipment, etc
  • Detail drawing (location plan, lay out, floor plan, etc)
  • Project scheduling
  • Cost estimation
  • Handing over process
  • Prepare a 3 D model/ graphic of the project to give a clear view on the every unit proposed
  • Analyze any risk of damage to the construction projects and public and conduct a project review with team members.
  • Prepare a detail report for every activity, that included;

(i) Front page
(ii) Profile of team members
(iii) Content
(iv) Introduction of project
(v) Work process
(vi) Conclusion
(vii) References
(viii) Appendix

  • Every progress is required to be documented in the log book/Work schedule.

This task contributes 20% (portfolio review) of the overall course assessment

BBY 31406 ASSESSMENT

No. Element Assessment Tools Percentage CLO
1 PROJECT 1) PROJECT RUBRICS

2) PORTFOLIO
CHECKLIST

Psikomotor (5%)
UniversityPsikomotor (5%) Industry
CLO3
2. PRESENTATION PRESENTATION RUBRICS Affective (5%)
UniversityAffective (5%)
Industry
CLO4

Criteria Rating Guideline

(1) Poor (2) Satisfactory (3) Good (4) Very Good (5) Excellent
No Task C 1 2 3 4 5 Score
CLO 3 (P7) W7-W12              
1 Student able to Discover one company that apply value chain and the Supplier partnering. P2              
2 Student able to Prepare the 3D model/ graphic of the project to give a clear view on every unit proposed P3              
3 Student able to Analyze the drawing/ graphic of the project to give a clear view. P4              
4 Student able to Sketches and draw Causeand-effect diagrams, and Check Sheets. P5              
5 Student able to Analyze any risk of damage to the construction projects and public. P6              
6 Student able to Conduct a project review with a team member. P7              
CLO4 (A4) W7-W12              
1 Student able to Discover Quality of sources (labor, materials, equipment) A1            
2 Student Able to Categorize the different building detailing drawing (location plan, lay out, floor plan) A2            
3 Student Able to Discover cost estimation for the whole project. A3            
4 Student able to Discover the Handing over process of the building in ethics. A4            
5 Student able to Suggest the quality improvement for the holistic factors in risk management construction project A5            
6 Student able to Prepare the report for quality improvement in the management construction process. A4            

PROGRESS CHECKLIST

No. Student Prepared: C/P/A Yes (2) Partially (1) No (0) Weightage (%) Marks
A. PORTFOLIO REVIEW            
1 Student Information         5  
2 Company Profile         5  
3 Construction Company Chart Organization         5  
4 Job Scope         5  
5 Log Book/Work schedule.         10  
6 Weekly Report

(i) Front page
(ii) Profile of team members
(iii) Content
(iv) Introduction of project
(v) Work process
(vi) Conclusion
(vii) References
(viii) Appendix

        5
5
10
5
5
5
5
5
 
7 Creativity (Flip Portfolio/Online Portfolio)         10  
B PRESENTATION         15  
  TOTAL         100

Order Custom Answers for BBY 31406 Construction Project Management Assignment

Order Non Plagiarized Assignment

Having trouble with your BBY31406 Construction Project Management assignment? Get expert assignment help and simplify your learning! Our free list of assignment examples and samples will guide you step-by-step, helping you understand difficult concepts. Whether it's derivatives, integrals, or problem-solving techniques, our Assignment Helper Malaysia provides clear explanations to enhance your skills. Don't let difficult assignments stop you—get the support you need and ace your course with confidence! Start your journey to success today!

Workingment Unique Features

Hire Assignment Helper Today!


Latest Free Samples for University Students

MSc Management Principles of Management Assignment Sample Answer

Category: Assignment

Subject: Management

University: BPP Business School

Module Title: Principles of Management

View Free Samples

ACC217 Accounting Information Systems Assignment Sample | SUSS

Category: Assignment

Subject: Accounting

University: Singapore University of Social Sciences | SUSS

Module Title: Accounting Information Systems (ACC217)

View Free Samples

ACC210 Accounting for Decision Making and Control Assignment Answers SUSS

Category: Assignment

Subject: Accounting

University: Singapore University of Social Sciences (SUSS)

Module Title: ACC210 Accounting for Decision Making and Control

View Free Samples

BUS105 Statistics Assignment Sample Solution Docx | SUSS

Category: Assignment

Subject: Business

University: Singapore University of Social Sciences

Module Title: Statistics (BUS105)

View Free Samples

MKT542 Digital Marketing Analytics Assignment Sample Answer

Category: Assignment

Subject: Marketing

University: Singapore University of Socical Sciences

Module Title: MKT542 Digital Marketing Analytics

View Free Samples
Online Assignment Help in UK