WM9F1-15 Procurement and Inventory Management Assignment Brief and Front Sheet PGT

Published: 01 Sep, 2025
Category Assignment Subject Management
University University of Warwick Module Title WM9F1-15 Procurement and Inventory Management
Word Count 2000 words +/- 10%
Assessment Type Written Report

WM9F1-15 Assignment Brief and Front Sheet PGT

This front sheet for assignments is designed to contain the brief, the submission instructions, and the actual student submission for any WMG assignment. As a result the sheet is completed by several people over time, and is therefore split up into sections explaining who completes what information and when. Yellow highlighted text indicates examples or further explanation of what is requested, and the highlight and instructions should be removed as you populate ‘your’ section.

This sheet is only to be used for components of assessment worth more than 3 CATS (e.g. for a 15 credit module, weighted more than 20%; or for a 10 credit module, weighted more than 30%).

To be completed by the student(s) prior to final submission:

Your actual submission should be written at the end of this cover sheet file, or attached with the cover sheet at the front if drafted in a separate file, program or application.
Student ID or IDs for group work    e.g. 1234567

To be completed (highlighted parts only) by the programme administration after approval and prior to issuing of the assessment; to be consulted by the student(s) so that you know how and when to submit:

Submission date (excluding extensions)

Tuesday 16th September 2025 by 12:00pm (UK Time)

Submission guidance

To be submitted electronically via Tabula

Late submission policy

If work is submitted late, penalties will be applied at the rate of 5 marks per University working day after the due date, up to a maximum of 10 working days late. After this period the mark for the work will be reduced to 0 (which is the maximum penalty). “Late” means after the submission deadline time as well as the date – work submitted after the given time even on the same day is counted as 1 day late.

For Postgraduate students only, who started their current course before 1 August 2019, the daily penalty is 3 marks rather than 5.

Resit policy

If you fail this module and/or component, the University allows students to remedy failure (within certain limits). Decisions to authorise resits are made by Exam Boards. These will be issued at specific times of the year, depending on your programme of study. More information can be found from your programme office if you are concerned.

If this is already a resit attempt, this means you will not be eligible for an additional attempt. The University allows as standard a maximum of two attempts on any assessment (i.e. only one resit). Students can only have a third attempt under exceptional circumstances via a Mitigating Circumstances Panel decision.

To be completed by the module leader/tutor prior to approval and issuing of the assessment; to be consulted by the student(s) so that you understand the assignment brief, its context within the module, and any specific criteria and advice from the tutor:

Module title & code

Procurement and Inventory Management WM9F1-15

Module leader

Dr Ahmed Tarek El-Said

Module tutor

Dr Ahmed Tarek El-Said, Dr Ibrahim Ali, Mr Philip Cullen

Assessment type

Written Report

Weighting of mark

50%

Assignment brief

Please refer to details in assignment brief below.

Word count

 

2000 words +/- 10%

Word count includes everything in the main body of the text (including headings, citations, quotes, lists, etc). Any title page, table of contents, table of tables, table of figures, content within figures/tables, list of references and any appendices are excluded.

Module learning outcomes (numbered)

1. Critically evaluate different procurement and inventory management strategies, processes, and organizational concepts and their links to further areas of the logistics system.

2. Develop and evaluate supplier selection systems under different supply chain scenarios within the procurement and inventory management processes.

3. Implement advanced techniques to calculate adequate stock levels for different stock categories considering logistics and financial aspects

4. Manage procurement and inventory risks arising from dynamic market structures to achieve a more resilient, sustainable supply chain.

5. Monitor and assess procurement and inventory performance through the use of specialised performance measurement tools and techniques.

Learning outcomes assessed in this assessment (numbered)

LOs: 1, 3, 4, 5.

Marking guidelines

Included at bottom of document

Academic guidance resources

Refer to the Module reading list, Module Moodle pages and verbal assignment guidance from the Module Tutors during the Module.

WM9F1-15 Assignment Brief

Semiconductor Chips Case Study

‘When chip shortages first shut down automotive production lines in 2021, the semiconductor industry found itself in an unaccustomed spotlight. Suddenly everyone was talking about the tiny chips that enable so many different car functions, from interior lighting to seat control to blind-spot detection. When some high-tech and consumer-electronics companies began to experience chip shortages or voiced concerns about supply chains, the attention intensified. It’s now clear to all: We are living in a semiconductor world’ (World Economic Forum, 2022).

‘Over the last decade, revenues generated by the global semiconductor industry have steadily increased, surpassing 550 billion U.S. dollars in 2021. In the coming years, semiconductor market revenues are expected to grow further, with predictions suggesting that the market will grow once more in 2022 to more than 600 billion U.S. dollars’ (Statista, 2022).

Figure 1 shows the market size for the semiconductor market worldwide. 

WM9F1-15 Procurement and Inventory Management Assignment

Figure 1: Semiconductor market size worldwide by application (Statista, 2022)

The Covid-19 pandemic brought a multitude of disruptions that heavily affected the semiconductor, or chip, supply chain. Automakers cut their chip orders in early 2020 as vehicles sales fell (Burkacky et al., 2022). However, by the time demand recovered faster than was anticipated in the second half of 2020, the industry had already repositioned its sales to meet demand from other applications (World Economic Forum, 2022).

Do You Need WM9F1-15 Assignment of This Question

Order Non Plagiarized Assignment

However, the current chip shortage is unlikely to be resolved soon, partly because of the complexities of the semiconductor production process. Typical lead times can exceed four months for products that are already well established in a manufacturing line (see Figure 2 below, Burkacky, et al., 2022). Increasing capacity by moving a product to another manufacturing site usually adds another six months (even in existing plants). Switching to a different manufacturer typically adds another year or more because the chip’s design requires alterations to match the specific manufacturing processes of the new partner. And some chips can contain manufacturer-specific intellectual property that may require alterations or licensing.

‘Many companies that need semiconductors are already reconsidering their long-term procurement strategies. Some, for instance, may shift from a “just-in-time” ordering model, which helps minimize inventory costs, to one in which they order semiconductors far in advance. For their part, many semiconductor companies are adjusting their long-standing strategies to remain strong’ (World Economic Forum, 2022).

WM9F1-15 Procurement and Inventory Management Assignment

Figure 2: Lead time for semiconductor production (Burkacky, et al., 2022)

You have just been hired by one of the leading automotive companies as their Chief Procurement Officer. The company is currently facing considerable delays and stoppage on their production lines due to shortages of semiconductor chips in all electronically controlled components. You have been asked to develop a new procurement strategy and processes for semiconductors, considering the new global market environment.

Q1. Inventory Management

Identify and recommend suitable inventory management tools and control policies that could be implemented to increase resilience across the semiconductor category. Discuss which performance indicators you would apply as a measure of your inventory resilience. (Hint: consider integrating 9-box model, different forecasting techniques, predictive analytics, service level and review level in you answer development).

(This question should be answered within 2,000 words with a 10% +/- allowance. The question is awarded 100 marks and covers Learning Outcomes 1, 3, 4, & 5).

Learning Outcome or Evaluative Criteria

 

Comments

80+

Outstanding

70-79

Distinction

60-69

Good Pass

50-59

Pass

40-49

 

Marginal Fail

<40

Fail

LO 1

Critically evaluate different procurement and inventory management strategies, processes, and organizational concepts and their links to further areas of the logistics system.

 

Comments

 

An exemplary answer, showing complete mastery of the learning outcome, with an exceptionally developed and mature ability to analyse, synthesise and apply concepts, models, and techniques.

All requirements of the learning outcome are exceeded, and the answer is free from errors.

The answer demonstrates originality of thought, with strong critical reflection and the ability to tackle issues not previously encountered.

Ideas are explained with great lucidity and in an extremely structured manner.

The answer covers a good range of procurement and inventory management concepts, tools, strategies, models or methods. The answer shows application of the models to the specific case using relevant examples.

An excellent answer, showing mastery of the learning outcome, with a highly developed and mature ability to analyse, synthesise and apply concepts, models, and techniques.

All requirements of the learning outcome are covered, and work is free from all but very minor errors.

There is good critical reflection and the ability to tackle issues not previously encountered.

Ideas are explained very clearly and in a highly structured manner.

The answer covers a range of procurement and inventory management concepts, tools, strategies, models, or methods. The answer shows application of the models to the specific case using relevant examples.

A strong answer, showing a sound grasp of the learning outcome and a skillful attempt at analysis, synthesis and application of concepts, models, and techniques.

All requirements of the learning outcome are covered, but there may be some minor errors.

There is some critical reflection, and a reasonable attempt is made to tackle issues not previously encountered.

Ideas are explained clearly and in a well organised manner, with some minor exceptions.

The answer covers a range of procurement and inventory management concepts, tools, strategies, models, or methods. The answer shows application of the models to the specific case using relevant examples.

A satisfactory answer, showing a grasp of the learning outcome but analysis, synthesis and application of concepts, models and techniques is mechanical, with a heavy reliance on course materials.

The requirements of the learning outcome are covered but with little or no critical reflection and limited ability to tackle issues not previously encountered.

Ideas are explained adequately but with some confusion and lack of organisation.

The answer covers a range of procurement and inventory management concepts, tools, strategies, models, or methods. The answer shows application of the models to the specific case using relevant examples.

An unsatisfactory answer. The learning outcome is not met, but it would not take too much to meet it.

There is a weak attempt at analysis, synthesis and application of concepts, models, and techniques.

Only some of the requirements of the learning outcome are covered.

Inability to reflect critically and difficulty in beginning to address issues not previously encountered.

Ideas are poorly explained and organised.

The answer covers a limited range of procurement and inventory management concepts, tools, strategies, models, or methods. The answer shows limited application of the models to the specific case using relevant examples.

An inadequate answer and there are extremely serious gaps in knowledge and many areas of confusion.

Few or none of the requirements of the learning outcome are covered.

 

There is a lack of serious engagement with the learning outcome and there is no evidence that issues not previously encountered can be addressed.

 The levels of expression and organisation in the work are very inadequate.

The answer does not cover a range of procurement and inventory management concepts, tools, strategies, models or methods. The answer does not show application of the models to the specific case using relevant examples.

LO 3

 

Implement advanced techniques to calculate adequate stock levels for different stock categories considering logistics and financial aspects.

 

Comments

An exemplary answer, showing complete mastery of the learning outcome, with an exceptionally developed and mature ability to analyse, synthesise and apply concepts, models, and techniques.

All requirements of the learning outcome are exceeded, and the answer is free from errors.

The answer demonstrates originality of thought, with strong critical reflection and the ability to tackle issues not previously encountered.

Ideas are explained with great lucidity and in an extremely structured manner.

The answer covers a range of methods, models, techniques required to develop inventory categories and relevant inventory control policies for stock level control.

An excellent answer, showing mastery of the learning outcome, with a highly developed and mature ability to analyse, synthesise and apply concepts, models, and techniques.

All requirements of the learning outcome are covered, and work is free from all but very minor errors.

There is good critical reflection and the ability to tackle issues not previously encountered.

Ideas are explained very clearly and in a highly structured manner.

The answer covers a range of methods, models, techniques required to develop inventory categories and relevant inventory control policies for stock level control.

A strong answer, showing a sound grasp of the learning outcome and a skillful attempt at analysis, synthesis and application of concepts, models, and techniques.

All requirements of the learning outcome are covered, but there may be some minor errors.

There is some critical reflection, and a reasonable attempt is made to tackle issues not previously encountered.

Ideas are explained clearly and in a well organised manner, with some minor exceptions.

The answer covers a range of methods, models, techniques required to develop inventory categories and relevant inventory control policies for stock level control.

A satisfactory answer, showing a grasp of the learning outcome but analysis, synthesis and application of concepts, models and techniques is mechanical, with a heavy reliance on course materials.

The requirements of the learning outcome are covered but with little or no critical reflection and limited ability to tackle issues not previously encountered.

Ideas are explained adequately but with some confusion and lack of organisation.

The answer covers a range of methods, models, techniques required to develop inventory categories and relevant inventory control policies for stock level control.

An unsatisfactory answer. The learning outcome is not met, but it would not take too much to meet it.

There is a weak attempt at analysis, synthesis and application of concepts, models, and techniques.

Only some of the requirements of the learning outcome are covered.

Inability to reflect critically and difficulty in beginning to address issues not previously encountered.

Ideas are poorly explained and organised.

The answer covers a limited range of methods, models, techniques required to develop inventory categories and relevant inventory control policies for stock level control.

An inadequate answer and there are extremely serious gaps in knowledge and many areas of confusion.

Few or none of the requirements of the learning outcome are covered.

There is a lack of serious engagement with the learning outcome and there is no evidence that issues not previously encountered can be addressed.

 The levels of expression and organisation in the work are very inadequate.

The answer does not cover range of methods, models, techniques required to develop inventory categories and relevant inventory control policies for stock level control.

LO 4

 

Manage procurement and inventory risks arising from dynamic market structures to achieve a more resilient, sustainable supply chain.

 

Comments

 

An exemplary answer, showing complete mastery of the learning outcome, with an exceptionally developed and mature ability to analyse, synthesise and apply concepts, models, and techniques.

All requirements of the learning outcome are exceeded, and the answer is free from errors.

The answer demonstrates originality of thought, with strong critical reflection and the ability to tackle issues not previously encountered.

Ideas are explained with great lucidity and in an extremely structured manner.

The answer focuses on the application and adaptation of procurement and inventory management tools, models, methods, strategies to the specific market environment of the provided case.

An excellent answer, showing mastery of the learning outcome, with a highly developed and mature ability to analyse, synthesise and apply concepts, models, and techniques.

All requirements of the learning outcome are covered, and work is free from all but very minor errors.

There is good critical reflection and the ability to tackle issues not previously encountered.

Ideas are explained very clearly and in a highly structured manner.

The answer focuses on the application and adaptation of procurement and inventory management tools, models, methods, strategies to the specific market environment of the provided case.

A strong answer, showing a sound grasp of the learning outcome and a skillful attempt at analysis, synthesis and application of concepts, models, and techniques.

All requirements of the learning outcome are covered, but there may be some minor errors.

There is some critical reflection, and a reasonable attempt is made to tackle issues not previously encountered.

Ideas are explained clearly and in a well organised manner, with some minor exceptions.

The answer focuses on the application and adaptation of procurement and inventory management tools, models, methods, strategies to the specific market environment of the provided case.

A satisfactory answer, showing a grasp of the learning outcome but analysis, synthesis and application of concepts, models and techniques is mechanical, with a heavy reliance on course materials.

The requirements of the learning outcome are covered but with little or no critical reflection and limited ability to tackle issues not previously encountered.

Ideas are explained adequately but with some confusion and lack of organisation.

The answer focuses on the application and adaptation of procurement and inventory management tools, models, methods, strategies to the specific market environment of the provided case.

An unsatisfactory answer. The learning outcome is not met, but it would not take too much to meet it.

There is a weak attempt at analysis, synthesis and application of concepts, models, and techniques.

Only some of the requirements of the learning outcome are covered.

Inability to reflect critically and difficulty in beginning to address issues not previously encountered.

Ideas are poorly explained and organised.

The answer does not focus on the application and adaptation of procurement and inventory management tools, models, methods, strategies to the specific market environment of the provided case.

An inadequate answer and there are extremely serious gaps in knowledge and many areas of confusion.

Few or none of the requirements of the learning outcome are covered.

There is a lack of serious engagement with the learning outcome and there is no evidence that issues not previously encountered can be addressed.

 

 The levels of expression and organisation in the work are very inadequate.

 

The answer does not focus on the application and adaptation of procurement and inventory management tools, models, methods, strategies to the specific market environment of the provided case.

LO 5

 

Monitor and assess procurement and inventory performance through the use of specialised performance measurement tools and techniques.

Comments

 

An exemplary answer, showing complete mastery of the learning outcome, with an exceptionally developed and mature ability to analyse, synthesise and apply concepts, models, and techniques.

All requirements of the learning outcome are exceeded, and the answer is free from errors.

The answer demonstrates originality of thought, with strong critical reflection and the ability to tackle issues not previously encountered.

Ideas are explained with great lucidity and in an extremely structured manner.

The answer includes a range of performance measures, metrics, indices used to monitor and control procurement and inventory management performance.

An excellent answer, showing mastery of the learning outcome, with a highly developed and mature ability to analyse, synthesise and apply concepts, models, and techniques.

All requirements of the learning outcome are covered, and work is free from all but very minor errors.

There is good critical reflection and the ability to tackle issues not previously encountered.

Ideas are explained very clearly and in a highly structured manner.

The answer includes a range of performance measures, metrics, indices used to monitor and control procurement and inventory management performance.

A strong answer, showing a sound grasp of the learning outcome and a skillful attempt at analysis, synthesis and application of concepts, models, and techniques.

 

All requirements of the learning outcome are covered, but there may be some minor errors.

There is some critical reflection, and a reasonable attempt is made to tackle issues not previously encountered.

Ideas are explained clearly and in a well organised manner, with some minor exceptions.

The answer includes a range of performance measures, metrics, indices used to monitor and control procurement and inventory management performance.

A satisfactory answer, showing a grasp of the learning outcome but analysis, synthesis and application of concepts, models and techniques is mechanical, with a heavy reliance on course materials.

The requirements of the learning outcome are covered but with little or no critical reflection and limited ability to tackle issues not previously encountered.

Ideas are explained adequately but with some confusion and lack of organisation.

The answer includes a range of performance measures, metrics, indices used to monitor and control procurement and inventory management performance.

An unsatisfactory answer. The learning outcome is not met, but it would not take too much to meet it.

 

There is a weak attempt at analysis, synthesis and application of concepts, models, and techniques.

Only some of the requirements of the learning outcome are covered.

Inability to reflect critically and difficulty in beginning to address issues not previously encountered.

Ideas are poorly explained and organised.

The answer includes a limited range of performance measures, metrics, indices used to monitor and control procurement and inventory management performance.

An inadequate answer and there are extremely serious gaps in knowledge and many areas of confusion.

 

Few or none of the requirements of the learning outcome are covered.

There is a lack of serious engagement with the learning outcome and there is no evidence that issues not previously encountered can be addressed.

 The levels of expression and organisation in the work are very inadequate.

The answer does not include a range of performance measures, metrics, indices used to monitor and control procurement and inventory management performance.

Buy Custom Answer Of WM9F1-15 Assignment & Raise Your Grades

Get A Free Quote

Seeking help with your WM9F1-15 Procurement and Inventory Management Assignment Report? now stress-free and get Professional Help With Management Assignment from our expert team. We also provide free assignment samples that have been written by PhD expert writers. We are available 24/7 to assist you. Now, be tension-free and focus on studying and give your assignment to our expert team. We will deliver your assignment before the deadline with well-researched results. Contact us today and boost your academic grades!

Workingment Unique Features

Hire Assignment Helper Today!


Latest Free Samples for University Students

RBP020L063H Leadership and Change Management Assignment Sample

Category: Assignment

Subject: Management

University: University of Roehampton

Module Title: RBP020L063H Leadership and Change Management

View Free Samples

HRMM080 Ethical and Responsible Leadership AS2 Reflective Portfolio Sample

Category: Assignment

Subject: Management

University: University of Northampton

Module Title: HRMM080 Ethical and Responsible Leadership

View Free Samples

ACAD1346 The child’s live Experience Developing Confidence Learners Assignment Sample

Category: Assignment

Subject: Education

University: University of Greenwich (UOG)

Module Title: ACAD1346 The child’s live Experience Developing Confidence Learners

View Free Samples

NUR7011 Developing Healthcare Leaders Assignment Sample | BPP

Category: Assignment

Subject: Nursing

University: BPP University

Module Title: NUR7011 Developing Healthcare Leaders

View Free Samples

Project Management, Leadership and Skills: Planning & Control Portfolio Example

Category: Assignment

Subject: Management

University: University of Salford Manchester

Module Title: Project Management, Leadership and Skills: Planning & Control

View Free Samples
Online Assignment Help in UK