| Category | Assignment | Subject | Education |
|---|---|---|---|
| University | Business and Technology Education Council (BTEC) | Module Title | Unit 06 Construction Information |
Having high expectations means challenging yourself to grow and achieve your full potential. When you aim for excellence, you sharpen your skills, build confidence, and set yourself apart for future opportunities. Challenge yourself to go beyond the basics, think critically, and showcase your best work. Success comes from effort, persistence and a mindset that embraces growth.
| AWARDING ORGANISATION: | Pearson |
| QUALIFICATION: | Higher Technical Qualification in Construction Management for England |
| UNIT NUMBER AND TITLE: | Unit 06 – Construction Information |
| LEARNING AIM/OUTCOME/OBJECTIVE(S):
|
3 – Generate construction information for a given project using industry-standard digital applications
4 – Present a package of construction information, including drawings, schedules and specifications for a given construction project |
| ASSIGNMENT TITLE: | Assignment 2 – Determining Different types of construction information and ways in which construction professionals collaborate. |
| ASSESSOR/TUTOR: | Abhishek Kadam |
| ISSUE DATE: | 08/01/2026 |
| SUBMISSION DATE: | 05/02/2026 |
| RE-SUBMISSION DATE (IF APPLICABLE): |
You have recently been appointed as an Assistant Engineer at a fast-growing main contractor firm in London. Traditionally focused on execution, the firm is now expanding into design and construction documentation services for private-sector clients. These services include in-house creation and coordination of construction drawings, schedules, and specifications, reducing reliance on external consultants.
Your team is now working on a student accommodation building located near a university campus in Hertfordshire, UK. The project is in the detailed design stage and will serve as a reference case for students and internal staff to understand construction documentation, coordination, and design-to-build integration.
Get Answer of BTEC Unit 06 Construction Information Assignment before Deadline
Pay & Buy Non Plagiarized Assignment40 m × 60 m
Total plot area: 2,400 m²
Building Footprint (All Floors 0–6)
Building footprint dimensions:
28 m × 42 m
Floor plate area (per floor): 1,176 m² gross internal area (GIA)
Coordination:
Construction Documentation:
Research-Focused Design:
Digital software proficiency through use of AutoCAD, Revit, or other BIM tools.
Technical accuracy and attention to detail when identifying and resolving design conflicts.
Analytical thinking in evaluating inconsistencies across multiple types of documents.
Professional communication via structured reporting and annotation of drawings.
Collaboration and coordination skills through understanding how various construction professionals’ interface through documentation.
Project organisation and document management, essential for real-world practice and compliance
Problem-solving and decision-making in proposing solutions to documentation errors.
Time management and planning through balancing multiple complex outputs under a deadline
| P5 | Create plans, sections, elevations and details for given a construction project, using industry-standard digital software. |
| P6 | Integrate dimensions, annotations and appropriate hatching for construction drawings of a given project. |
| P7 | Output construction drawings, to scale, on industry-standard sheet sizes for a given project. |
| P8 | Coordinate information; both paper-based and digital, presented in schedules and specifications with construction drawings |
| M3 | Demonstrate the use of modification tools to assist in the development of accurate construction drawings. |
| M4 | Manage the use of printing and non-printing layers to develop coherent construction information output. |
| D2 | Justify the approach to producing construction information for a given project, highlighting examples of good practice in the use of industry-standard digital applications |
1.Produce Corrected Construction Drawings:
2. Generate Supporting Schedules and Specifications:
3. Coordinate and Present Final Package:
To demonstrate achievement of the learning outcomes, your submission must include:
1.Construction Information Review Report (3,000–4,500 words)
2. Set of Construction Drawings Created in CAD or BIM Software
3. Annotated Drawings with Dimensions, Layers, Hatching, etc.
4. Drawing Sheets to Scale on A3 Paper (Print) and A1 PDF (Canvas)
5. Coordinated Package with Schedules and Specification Links
6. Reflective Commentary
Order Custom Answer for BTEC Unit 06 Construction Information Assignment
Order Non Plagiarized AssignmentLooking for help with your BTEC Level 4 /5 Unit 06 Construction Information Assignment? Our easy and creative BTEC Assignment Help is here to support you! With our Assignment Examples and Samples, you’ll see how to structure and write your assignment clearly. Our Assignment Help services offer friendly, simple explanations so you can understand concepts without confusion. Get expert guidance, save time, and improve your grades — all with 100% original, plagiarism-free help made just for you!
Hire Assignment Helper Today!
Let's Book Your Work with Our Expert and Get High-Quality Content